Q. A and B can complete a piece of work in 30 days, B and C in 20 days, and C and A in 15 days. If all of them work together, the time taken in completing the work will be:
(1) 10 days (2) 12 days
(3)12 2/3 days (4)13 1/3 days
0 टिप्पणियाँ:
एक टिप्पणी भेजें